SPG collaborated with Dutch contractor Feijenoord to undertake the removal of a coating system containing hexavalent chromium using RPR Heat Induction.

Specialist Painting Group have recently undertaken a controlled environment, trial application removing an existing coating system containing Hexavalent Chromium using RPR heat induction. Airborne pollution was measured on site by a third part laboratory to determine environmental impact and exposure of operatives to hazardous substances

Case Studies

Reactor Tanks

SPG have implemented RPR heat induction technology to remove the existingcoating system from seven reactor tanks insidea potable water facility. Ab...

Read More

Royal Victoria Overgrou...

Royal Victoria Station which is one of the station assets on the East and Central Routes of the Docklands Light Railway (DLR). Areas of the structure ...

Read More

HB41 Cable Bridge

Specialist Painting Group undertake the refurbishment of the Finchley Station Cable Bridge. HB41 was constructed in 1939 and is a continuous three spa...

Read More