Woburn Safari Park

Woburn Safari Park


The Sea Lion Centre at Woburn Safari Park encompasses an external habitat and viewing gallery for the sea lions to spend their days and the public to watch them.  Inside the existing building the sea lion staff unearthed an old internal pool underneath the floor structure. Specialist Painting Group were called into to survey the surfaces of the pool area and specify a pool coating system.  We found a coating system from Denmark that met all the requirements of the project and began cleaning and preparing the pool area.  We installed the coating system over a complete weekend using airless spray.  The coating system comprised of a two component, advanced epoxy resin, a two component epoxy clear topcoat with extended UV stability.  The new pool now stands as the centre piece of the new family sea lion show at Woburn Safari Park.

      

Case Studies

Irthlingborough Lock

Working in collaboration with JN Bentley, SPG successfully demonstrated the benefits of implementing a more efficient process of coating removal, surf...

Read More

London Eye

SPG supported Red 7 Marine in the refurbishment of the London Eye substructure. The substructure of the London Eye is located in the Thames riverun...

Read More

Volvo Footbridge

Specialist Painting Group Ltd were invited to represent VolkerLaser on behalf of Kier Highways, to remove the existing coatingsystem from the A404 Vol...

Read More