Proctor Roofing

Proctor Roofing

Our clients internal valley gutters had been allowing water ingress into the production area directly below.  The existing lining and roofing membrane had suffered deterioration and the decision was made to replace the complete system with new seamless gutter lining and roofing system.

Specialist Painting Group secured the order for the replacement roofing membrane and gutter lining.  The entire surface area was prepared using a closed box, high pressure jetting system to the specified standard.  All of the drains were blocked with single micron filter to contain debris from entering the down pipes.

Once the preparation had been completed, inspected and signed off by a third party the installation of a single component polymer system was completed.  The ambient conditions at the time of the installation caused some concern as the steel surface temperature remained close to placing the project out of specification. Environmental conditions were monitored and recorded by the SPG Project Manager, this report was then uploaded to our client as part of our QA/QC procedure.

The roofing membrane and gutter lining system resolved the problem of water ingress for our client.

      

Case Studies

Skanska

Transport for London asset D2 is a steel footbridge located near South Harrow Station. The steel footbridge consists of steel members to the main span...

Read More

Wessex Water

The retained coating system inside the pressure filters had delaminated. The coating system had suffered a 100% failure due to issues surrounding the ...

Read More

Offshore Dive Chambers

An offshore and marine service provider chose Dri Ice Global and SPG to complete the refurbishment of seven off shore dive chambers aboard the one of ...

Read More