North Hykeham Power Station

North Hykeham Power Station

SPG have been supporting FCC Environmental with the remedial repairs to the intumescent fire protection on the 40 meter high external columns at North Hykeham Power Station.  The existing coating system had suffered water ingress over time and areas of the underlying intumescent coating had failed.  Our ICATS Engineers removed the areas that had failed and installed a two component intumescent filler prior to the application of a UV stable polyurethane topcoat.

 

 

Case Studies

Royal Victoria Overgrou...

Royal Victoria Station which is one of the station assets on the East and Central Routes of the Docklands Light Railway (DLR). Areas of the structure ...

Read More

HB41 Cable Bridge

Specialist Painting Group undertake the refurbishment of the Finchley Station Cable Bridge. HB41 was constructed in 1939 and is a continuous three spa...

Read More

Waalbrug Bridge, Nijmeg...

SPG collaborated with Dutch contractor Feijenoord to undertake the removal of a coating system containing hexavalent chromium using RPR Heat Induction...

Read More