SPG have been supporting FCC Environmental with the remedial repairs to the intumescent fire protection on the 40 meter high external columns at North Hykeham Power Station.  The existing coating system had suffered water ingress over time and areas of the underlying intumescent coating had failed.  Our ICATS Engineers removed the areas that had failed and installed a two component intumescent filler prior to the application of a UV stable polyurethane topcoat.

 

 

Case Studies

Liquid Applied Insulation

Specialist Painting Group participatedin the successful executionof a new liquid applied insulation technology. The project was carried out on a major...

Read More

Reactor Tanks

SPG have implemented RPR heat induction technology to remove the existing coating system from seven reactor tanks inside a potable water facility. ...

Read More

Royal Victoria Overgrou...

Royal Victoria Station which is one of the station assets on the East and Central Routes of the Docklands Light Railway (DLR). Areas of the structure ...