London Gateway Port

London Gateway Port

Specialist Painting Group supported Trelleborg Marine Systems in the application of a Chemco International protective coating system at the DP World, London Gateway Port.

Rope access was utlilised to paint the berthing fenders with SPG providing IRATA level 1, ICATS Applicators for the duration of the project.

This maintenance project is ongoing and is due to be completed in 2019.

Case Studies

Reactor Tanks

SPG have implemented RPR heat induction technology to remove the existingcoating system from seven reactor tanks insidea potable water facility. Ab...

Read More

Royal Victoria Overgrou...

Royal Victoria Station which is one of the station assets on the East and Central Routes of the Docklands Light Railway (DLR). Areas of the structure ...

Read More

HB41 Cable Bridge

Specialist Painting Group undertake the refurbishment of the Finchley Station Cable Bridge. HB41 was constructed in 1939 and is a continuous three spa...

Read More