Jacobs Crackers

Jacobs Crackers

SPG have recently compeleted the re-furbishment of several large mild steel process mixing bowls for a large food processing client.  Our customer had been experiencing problems with condensation forming on the outer surface of the mixing bowls.  These assets were mechancially prepared to achieve the required surface profile, with a two component, epoxy based insulated coating system being installed. This coating system was applied using plastic application tools to achieve a film thickness of 5mm, the surface temperature of the mixing bowls has been increased by 10ºC and has eliminated the condensation issue on site.

     

Case Studies

Skanska

Transport for London asset D2 is a steel footbridge located near South Harrow Station. The steel footbridge consists of steel members to the main span...

Read More

Wessex Water

The retained coating system inside the pressure filters had delaminated. The coating system had suffered a 100% failure due to issues surrounding the ...

Read More

Offshore Dive Chambers

An offshore and marine service provider chose Dri Ice Global and SPG to complete the refurbishment of seven off shore dive chambers aboard the one of ...

Read More