Fritolay

Fritolay

Specialist Painting Group have recently completed another installation of the Ti220 insulation system for PepsiCo, Fritolay in Tarsus, Eastern Turkey.

 


The Ti220 product range has recently been approved globally by PepsiCo central engineering team.  The product manufacturer EnerTherm worked to demonstrate the effectiveness of the material at reducing energy costs across multiple sites.

Pepsico, Tarsus incinerator houses a 12 MW burner with the external surface temperatures reaching between ninety and one hundred degrees Celsius. The Ti220 application is designed to reduce these surfaces temperatures along with the sites annual gas consumption.

 

 

 

 

 

Case Studies

Reactor Tanks

SPG have implemented RPR heat induction technology to remove the existingcoating system from seven reactor tanks insidea potable water facility. Ab...

Read More

Royal Victoria Overgrou...

Royal Victoria Station which is one of the station assets on the East and Central Routes of the Docklands Light Railway (DLR). Areas of the structure ...

Read More

HB41 Cable Bridge

Specialist Painting Group undertake the refurbishment of the Finchley Station Cable Bridge. HB41 was constructed in 1939 and is a continuous three spa...

Read More