316 Engineering

316 Engineering

SPG were contracted to install a two component, high build epoxy coating system with a UV stable topcoat to a carbon steel fertiliser deck weighing in excess of twenty tonnes.  The steel decking was blast cleaned to a (BS EN ISO 8501-1) SA2.5 standard of preparation in the contained blasting area in Peterborough.  The coating was installed using a high performance airless spraying rig.  The finished film thickness was measured at 300µm.  We anticipate another fertiliser deck being completed by SPG later this year.

 

Case Studies

Irthlingborough Lock

Working in collaboration with JN Bentley, SPG successfully demonstrated the benefits of implementing a more efficient process of coating removal, surf...

Read More

London Eye

SPG supported Red 7 Marine in the refurbishment of the London Eye substructure. The substructure of the London Eye is located in the Thames riverun...

Read More

Volvo Footbridge

Specialist Painting Group Ltd were invited to represent VolkerLaser on behalf of Kier Highways, to remove the existing coatingsystem from the A404 Vol...

Read More